Service Line 02

Electrical Design-Build

Single-source electrical delivery — design, build, energize, walk away.

We eliminate the traditional design-bid-build handoff. One team owns electrical from concept through commissioning, collapsing schedule, reducing RFIs, and giving you one throat to choke.

1Point of accountability
20-30%Typical schedule compression
IBEWUnion & non-union capable
Electrical Design-Build
−10% TIC+25%
Industry benchmark · Service line 02

AWP-driven design-build cuts total installed cost by up to 10% while lifting field productivity 25%.

Construction Industry Institute research across 50+ capital projects shows Advanced Work Packaging lowers TIC by as much as 10%, improves field productivity 25%, and delivers a 4:1–6:1 ROI — the largest documented gain from any single construction best practice.

What we deliver

A complete service, not a deliverable list

We pair senior engineers with field-experienced technicians — every project is staffed to match the specific problem, not the billable hour.

Integrated Design + Build

One contract from one-line to energization — no design-to-construction handoff gap.

Self-Perform Construction

In-house electrical craft for MCCs, cable tray, conduit, terminations, and switchgear installation.

Equipment Procurement

Direct vendor relationships on switchgear, transformers, MCCs — negotiated lead times and pricing.

Commissioning Integration

Build it, test it, start it up — same team, same quality standard throughout.

Budget Certainty

GMP and fixed-price delivery models with transparent open-book accounting.

Field Engineering

Engineers on-site during construction — RFIs resolved in hours, not weeks.

Capabilities

Depth where it matters

Rev1 Energy's electrical design-build practice is staffed by engineers and technicians with real industry experience — not generalists. We know what "good" looks like because we've built, tested, and energized it hundreds of times.

  • 01
    Project Types

    Substations 480V–138kV, MCC buildings, switchgear lineups, large motor installations, UPS and battery systems.

  • 02
    Schedule Compression

    Concurrent design, procurement, and construction — pull planning with Last Planner System.

  • 03
    Safety Record

    0.0 TRIR target · OSHA VPP-alignment · daily JSA, JHA, and stretch-and-flex culture.

  • 04
    Documentation

    TrackerProgress for real-time progress · TrackerCheck for handover · digital turnover packages.

How we partner

We speak to every level of your organization

Boardroom to field — each tier of your team has a different question, a different risk, and a different definition of success. Here's how Rev1 delivers value at each one.

Executive Leadership

C-Suite · VP Engineering · VP HSE · Operations Leaders

Predictable outcomes. Board-defensible documentation. Portfolio-wide partners they can stake a reputation on.

What Rev1 delivers

Program-level accountability — single point of ownership across portfolio, audit-ready records, executive read-outs, insurance and regulator defensibility.

Directors & Program Managers

Construction · Commissioning · Safety · Engineering Directors

On-time, on-budget delivery across multiple projects — without becoming the single point of failure.

What Rev1 delivers

Scalable capacity with one playbook — TrackerCheck-driven progress and completions, Oracle AWP-native workflows, repeatable deliverables every crew uses the same way.

Engineers & Technical Influencers

PE gatekeepers · Lead Engineers · Commissioning Managers

Methodology they can audit. Standards they respect. Tools and templates that match the way they already work.

What Rev1 delivers

PE-stamped models and traceable calcs — IEEE 1584-2018, NFPA 70E, ANSI/NETA ATS-2025; SKM and ETAP native; every assumption documented and defendable.

Field Teams & End Users

Foremen · Electricians · Technicians · Operators

Clean labels. Working tools. A foreman on site who's turned wrenches — not just drawn lines.

What Rev1 delivers

Crews who have done this before — NETA III/IV technicians, journeyman foremen on site, mobile-first TrackerCheck that works offline, punch lists closed in hours not weeks.

One teamFrom kickoff to energization
One ownerSingle point of accountability
Zero handoffsSame crew every tier trusts
Proof

Work that moved the needle

138kV substation delivered 8 weeks ahead of schedule
Case Study · Data Center Substation

138kV substation delivered 8 weeks ahead of schedule

Hyperscale data center client needed a 138/34.5kV substation energized to support an expansion deadline. Rev1 Energy self-performed the design, procurement, and construction — compressing schedule by 8 weeks versus the traditional design-bid-build approach.

138 kVPrimary voltage
8 weeksAhead of baseline
$0Change orders
"The design-build model saved us months. Rev1 Energy's crews had the schematics in the field the same day they were IFC." — Operations Readiness Lead
Let's talk

Ready to put electrical design-build on your next project?

Tell us about your project scope, schedule, and biggest risks — we'll come back with a tailored plan within 48 hours.